EASTGATE
Construction Start 4/15/2016 – 7/1/2016
  • New guard house with a  new drive-through canopy to be built where the existing house is now.
  • Roadway from Military Trail to the new guard house to be widened so a dedicated Resident’s lane can be installed. The paving of the roadway will continue to Century Boulevard.
  • New fencing will be provided on each side of the roadway.
WESTGATE
Construction Start Date 7/1/2016 – 10/1/2016
  • New guard house with a new drive-through canopy to be built where the existing house is now.
  • Roadway from Fire Station/Powerline Road) to the new guardhouse tobe widened so adedicated Resident’s lane can be installed. The paving of the roadway will continue to Century Boulevard.
  • New fencing will be provided on the north side of the roadway only.
MAINGATE (Hillsboro)
Construction Start Date 4/15/2017 – 7/15/2017
  • New guardhouse with 2 double drive-through canopies to be built in a location further from Hillsboro Boulevard (distance to be determined), paving will continue until Swansea and Upminster.
  • Design new site walls consistent with the design scheme of the new house, along with new fencing on both sides of the roadway.